Skip to content

Split

Split icon

Purpose

Divides the rows into two groups by percentage: an Estimation group and a Validation group (the usual build and test split).

When to use it

Develop a rule on one part of the data and test it on the rest, or take a reproducible portion of a population.

Inputs and outputs

Socket Carries
Input The table
E (Estimation) The first part, sized by Estimation %
V (Validation) The rest

Settings

One section, Split. Its info line reads "Estimation rows first; the rest go to Validation."

Control Default Effect
Method Random Random shuffles the rows first. Sequential keeps the input order.
Estimation % 70 1 to 99: the share that goes to E.
Random seed 42 0 to 2,147,483,647. Shown only for Random. The same seed on the same data always gives the same split.

Worked example

Ten rows numbered 1 to 10, Estimation % = 70.

  • Sequential: E gets rows 1 to 7, V gets rows 8 to 10.
  • Random with seed 42: E gets rows 2, 1, 7, 3, 6, 4, 5 (in shuffled order) and V gets 10, 9, 8.

Edge cases and limits

  • The split point is "row position below (number of rows minus 1) times the percentage", so sizes are close to the percentage, not always exact. With 5 rows and 50 percent, 2 rows go to E and 3 to V. With a single row, E is empty and the row goes to V.
  • In Random mode rows come out in shuffled order, not input order.
  • Preview uses 100 rows: the preview splits the sample, Run splits the whole table, so the rows that land in E and V differ.
  • This is not a statistical sampler; for audit samples use the Sample test in Audit nodes.

Messages you may see

TD-SHAPE-004 ("Estimation percent must be between 1 and 99"), TD-SHAPE-005.

Tips

Record the seed with your workpapers so someone else can reproduce the split.

Back to the Preparation node index.