Split¶
Purpose¶
Divides the rows into two groups by percentage: an Estimation group and a Validation group (the usual build and test split).
When to use it¶
Develop a rule on one part of the data and test it on the rest, or take a reproducible portion of a population.
Inputs and outputs¶
| Socket | Carries |
|---|---|
| Input | The table |
| E (Estimation) | The first part, sized by Estimation % |
| V (Validation) | The rest |
Settings¶
One section, Split. Its info line reads "Estimation rows first; the rest go to Validation."
| Control | Default | Effect |
|---|---|---|
| Method | Random | Random shuffles the rows first. Sequential keeps the input order. |
| Estimation % | 70 | 1 to 99: the share that goes to E. |
| Random seed | 42 | 0 to 2,147,483,647. Shown only for Random. The same seed on the same data always gives the same split. |
Worked example¶
Ten rows numbered 1 to 10, Estimation % = 70.
- Sequential: E gets rows 1 to 7, V gets rows 8 to 10.
- Random with seed 42: E gets rows 2, 1, 7, 3, 6, 4, 5 (in shuffled order) and V gets 10, 9, 8.
Edge cases and limits¶
- The split point is "row position below (number of rows minus 1) times the percentage", so sizes are close to the percentage, not always exact. With 5 rows and 50 percent, 2 rows go to E and 3 to V. With a single row, E is empty and the row goes to V.
- In Random mode rows come out in shuffled order, not input order.
- Preview uses 100 rows: the preview splits the sample, Run splits the whole table, so the rows that land in E and V differ.
- This is not a statistical sampler; for audit samples use the Sample test in Audit nodes.
Messages you may see¶
TD-SHAPE-004 ("Estimation percent must be between 1 and 99"), TD-SHAPE-005.
Tips¶
Record the seed with your workpapers so someone else can reproduce the split.